30 minutes, free: book your first call
Back to blog

How do you test whether an AI use case is worth it before investing in a full build?

Published on
Last checked:
4 min read
Tags:AI prototypeproof of conceptprocess automation

You test an AI use case by measuring what it costs today, then building a small prototype and checking its results against that measurement. We call this method Measure first, then build.

What should an AI proof of concept prove?

A proof of concept for AI should show whether AI changes the cost of one specific process in your business. For that one process, run on real cases, it answers one question. Does the AI prototype do the work faster, slower or about the same as today?

Research reported in 2025 puts figures on how many proofs of concept stop before production. One study, reported on 25 March 2025, found that “88% of observed POCs don’t make the cut to widescale deployment”. Its authors name “unclear ROI” among the challenges organisations work to overcome.

A survey reported on 14 March 2025 found that “the average organization scrapped 46% of AI proof-of-concepts before they reached production”.

Which use case should the prototype take on first?

The choice happens in a workshop of four to six hours. In it, you and your team pick the one process the prototype will take on. You sign off on its requirements before any build work starts.

The people who run the process take part in this workshop. The current cost of the process is measured there, with them in the room.

How do you measure what the process costs before AI touches it?

The baseline is measured in minutes per case and cases per month, at your own stated rate. It reflects your process as it runs today.

The baseline figures are recorded in the contract before the build starts.

How do you test an AI prototype on real cases?

On working days eight and nine, the prototype runs against real cases from the process you chose.

The result is measured the same way as the baseline, in minutes per case and cases per month.

What happens to your data during an AI prototype?

Before anything is loaded into the prototype, where that data will be processed is agreed in writing.

If your data cannot leave your own systems, that goes into the requirements signed at the workshop, before the build starts.

When is stopping after the prototype the right call?

After the AI prototype has run on real cases, the decision sits with the client. The presentation that closes the AI Prototype states the recommendation plainly, including when stopping is the right answer.

Test your own AI use case before you build it

Our AI Prototype offer walks through the Measure first, then build method, from the workshop to the final recommendation.

See the AI Prototype offer

Sources

  1. CIO, 88% of AI pilots fail to reach production, but that’s not all on IT, 25 March 2025 (IDC research with Lenovo) (retrieved 29 October 2026): https://www.cio.com/article/3850763/88-of-ai-pilots-fail-to-reach-production-but-thats-not-all-on-it.html
  2. CIO Dive, AI project failure rates are on the rise: report, 14 March 2025 (S&P Global Market Intelligence survey) (retrieved 29 October 2026): https://www.ciodive.com/news/AI-project-fail-data-SPGlobal/742590/